Name | Vibrating level indicator |
---|---|
Type | ILV-660 – ref: 2190-0-100 |
Supply voltage | 20 – 250 V AC/DC |
Power consumption | 3 VA |
Density of the product | From 0,05 t/m3 |
Maximum pressure | +10 bar |
Cable entry | 2 of M16x1,5 |
Relay output | 1 NO + 1 NC 5 A / 250 V AC 5 A / 30 V DC |
Function status | Under voltage: yellow LED Relay enabled: red LED |
Resonance frequency | 460 Hz |
Response time: | |
Detecting level | 1 s |
Starting vibrating | 2 – 5 s |
Product temperature | -20° C – +80° C (Under request up to +150º C) |
Ambient temperature | -20° C – +60° C |
Protection: | |
Housing | IP66 according to DIN EN60529 |
Probe | IP67 according to DIN EN60529 |
Weight | 1,10 Kg |
Max. load upon the probe | 80 N |
Materials: | |
Housing | Aluminium |
Probe | Stainless Steel 1.4301 |
- Productos
- Control of solids
- ILV-600
Intended use
Vibrating level indicator with small probe. Multivoltage model, with sensitivity adjustment and detection type adjustement. There is a non sensible part between the probe and housing to avoid the possible settlement of material over the probe or silo wall.
To be used to control the maximum or minimum level of bulk solids in silos or vessels and recommended for dusty and powdery, granulated and grainy bulk goods like dust, flour, grain, sand, plastic, etc. with a minimum bulk density from 0.05 t/m3 and a maximum grain size of 20 mm.
Function
The probe must to be exposed to the material. The probe of these controllers is activated to its resonant frequency by a piezoelectric system. When the product covers the probe, the vibration is dampened and the control unit reverses the signal.
When the product disappears from the probe, it returns to the normal vibrating state and the signal turns to the initial position.
Mechanical connection
The device can be mounted horizontally or vertically depending on the model.
The normal installation is by screwing the device onto the deposit wall, with a mounting flange or with an appropiate support to fix it. For a proper function, the device should be installed with a 20º to 30º slope from the horizontal onto the silo wall to to facilitate the flow of the material and to prevent the material from remaining over the probe.