Name | Vibrating level indicator |
---|---|
Type | ILV-150 ATEX – ref: 2190-A-500 |
Certification | B1 Dust: ATEX II 1/2D Ex ta/tb IIIC T95° C Da/Db |
Supply voltage | 20 –250 V AC/DC |
Power consumption | 3 VA |
Density of the product: | |
Standard model | From 0.02 t/m3 |
Sensitive model | From 0.01 t/m3 |
Maximum pressure | +10 bar |
Cable entry | 2 of M20x1.5 |
Relay output | 2x (1 NO + 1 NC) 8 A / 250 V AC 8 A / 24 V DC |
Function status | Relay enabled: red LED |
Resonance frequency | 285 Hz |
Response time: | |
Detecting level | 1 second |
Starting vibrating | 2 – 5 seconds |
Product temperature | -40° C – +70° C |
Ambient temperature | -40° C – +60° C |
Protection: | |
Housing | IP66 according DIN EN60529 |
Probe | IP67 according DIN EN60529 |
Weight | 1.70 Kg depending on shaft length |
Max. load upon the probe: | |
Horizontal | 150 N |
Vertical | 1.000 N |
Max. cable load | 200 Kg |
Materials: | |
Housing | Aluminum |
Probe | Stainless Steel 1.4301 |
Cable | Double insulation Polyuretane and shielded cable |
- Productos
- ATEX controllers
- ILV-150 ATEX
ILV-150 ATEX
Intended use
Vibrating level indicator with probe and rope shaft for vertical mounting. Strong and multivoltage model, with sensitivity adjustment and detection type adjustement. For use in potentially explosive Dust atmospheres hazardous area.
Versatile, with a wide range of applications.
To be used to control the maximum or minimum level of bulk solids in silos or vessels and recommended for dusty and powdery, granulated and grainy bulk goods like dust, flour, grain, sand, plastic, etc. with a minimum bulk density from 0.01 t/m3.
Function
The probe must to be exposed to the material. The probe of these controllers is activated to its resonant frequency by a piezoelectric system. When the product covers the probe, the vibration is dampened and the control unit reverses the signal.
When the product disappears from the probe, it returns to the normal vibrating state and the signal turns to the initial position.
Mechanical connection
The device has to be mounted vertically.
The normal installation is by screwing the device onto the deposit wall, with a mounting flange or with an appropiate support to fix it.